Сезон 10, Серия 23

Barrington Project

How the cracked asphalt in the driveway has been replaced with new concrete pavers; and why high-end cherry veneers are being used for the custom cabinets. Also: hanging the last of the wall cabinets; setting a soaking tub in freshly mixed plaster. In the second half: financing and installing solar photovoltaic panels; framing the walls for a basement remodeling project.

Комментарии

Войдите, чтобы оставить комментарий. Войти
Пока нет комментариев