Docked Out

Docked Out

Закончен1 сезон
Сезон 1, Серия 1

Split Level Entertaining Dock

30 мин.

Marine contractor Jason and his team build a 2400 square foot split level entertaining dock, complete with a water slide, kitchen, dining area and double boat slip for a family of four. Faced with an extremely tight six week deadline, weather delays and the challenge of building on the water, the design and construction crews work double time to get this job completed.

Комментарии

Войдите, чтобы оставить комментарий. Войти
Пока нет комментариев